Fully-air conditioned engineering facility | 39,568 available SF, clear span space
3240 E Universal Way, Tucson, AZ
This facility is a part of Universal Avionics Systems Corporation’s 165,505 square foot headquarters/R & D/engineering building located in a high-quality business park near the Tucson International Airport.
Built in 2004, this building has many features that make it exceptional, including raised floor throughout and highly sophisticated temperature and humidity controls in the clear span space. Cabling is in place for data and communications, and this all air-conditioned space is ready for immediate occupancy.
The facility can be divided into 17,330 and 22,237 square foot space, or leased as a single unit. Parking is expandable from the 202 spaces offered (5:1000) on about 2 acres of adjacent excess land.


